Environmental and cost savings by leak detection quantification
Callidus' leak detection quantification service provides LNG client cost savings of 386,280 AUD per day.
Read moreRedesigning failing valve body
A valued client referred to Callidus to fix a repeating incident of failing valve body inline due to external cyclic loading.
Read moreWeld overlay design and build
Callidus modified existing inventory with this weld overlay build for an end user in the LNG industry.
Read moreStem clamp design by engineering
Callidus' engineering team developed bespoke tooling for a stem clamp to help a client save cost and time in an LNG facility shutdown.
Read moreBlast tube repair for HPAL customer
One of the major activities of the Callidus Philippines branch during the first quarter of 2021 was a high pressure blast tube repair.
Read more