Part of the work carried out at CWS is the repair of Cl1 AS 1210 Pressure Vessels.
These vessels are used as containment for hot acidic slurry and as a result have internal erosion and corrosion issues that requires routine maintenance.
When it’s time for a review of our confined spaces procedures we always make sure to get the experts involved. This huge task requires expertise from a number of different areas – from the team that scope the job, right through to the emergency team from our local Department of Fire and Emergency Services.
A huge thanks to Troy and his team for making time to come out and review the procedures with us.